PINE BREEZE DAIRY
OUR SOLUTION
The facility went from 400 cows to 2,500 cows after construction
Original facility was remodeled and made into the special needs barn
A double 35 parallel parlor with a subway and (4) 570 tunnel ventilated freestall barns were added to the existing facility along with a special designed tunnel ventilation system
This project was completed on time and in budget through the winter
Questions about a commercial construction project? Talk directly with Dean Hunt, Vice President of Business Development & Marketing 920.498.9300, or DHunt@baylandbuildings.com.